Who Do I Hire to Remodel my Kitchen?
← Back to the blog
RemodelingSeptember 7, 2026· 4 min read

Who Do I Hire to Remodel my Kitchen?

The right trade for this job, what it typically costs in Florida, and how to describe the work so quotes come back accurate.

By QOTA Team

Hire a licensed general contractor or kitchen remodeler to manage a kitchen remodel, especially if it involves plumbing, electrical or wall changes. For cabinets or countertops alone, a specialty installer may be enough.

Short answer: hire a licensed kitchen remodeler. If walls, plumbing, or electrical move, you need a licensed general contractor holding the permit — not a cabinet installer coordinating trades informally.

Why this is the right trade

A kitchen remodel with any wall, plumbing, or electrical change needs a licensed general or building contractor, plus licensed subs for each trade.

Getting the trade right on the first call saves you a wasted service fee and, more often, a second week of waiting.

What it usually costs

What a kitchen remodel costs: according to HomeGuide's national kitchen remodel cost guide, a basic remodel costs about $4,000–$18,000, a full remodel $15,000–$50,000, and a high-end remodel $50,000–$70,000 or more. These are national figures, so get itemized written quotes for your South Florida kitchen.

How to describe the job so quotes are accurate

  • Take three photos: wide, close, and the model or label plate if there is one.
  • Say when the problem started and whether it is getting worse.
  • Note anything you already tried, so nobody bills you to repeat it.
  • Mention access: gate codes, stairs, elevator reservations, or pets.

Ready for real quotes?

Post your project free and compare quotes from verified local pros.

Post a project

Signs you called the right pro

  • They ask about cabinet boxes swelling at the sink base.
  • They ask about layout that forces two people to cross paths constantly.
  • They ask about appliances you have already replaced twice in the same tired footprint.

Red flags

  • no allowance schedule for tile, counters, fixtures, and appliances
  • demolition starting before the permit is issued

Six to twelve weeks on site once cabinets arrive; plan for two to four months door to door.

Ready to compare real numbers? Pros join QOTA free and keep 100% of their quote. Homeowners post projects free and pay a simple 5% QOTA fee when they hire, with payments held safely until the work is done. Post your project on QOTA.

Keep reading

Frequently asked questions

Need work done?

Get quotes from trusted local contractors on QOTA.

Start a project

Want more jobs?

Join QOTA today.

Join as a Pro